“Replacement of
OFC on age cum condition basis in LKO territory in the sections (1) Lucknow- Sultanpur-Jaunpur(2)Burwal-Gonda-Khalilabad for OFC route strengthening
in northern region of Railtel Corporation Of India Limited.”
2
Northern
Works
Railtel/Tender/OT/NR/O&M/16-17/15
2016-10-10
“Deployment of maintenance teams in Phulera-Ajmer-Beawar-Sendra,Marwar-Luni,Sendra- Marwar-Bhagwanpura,Bhagwanpura-AbuRoad-Palanpur sections including all LMC’s (Three
teams) (549.84 kms) for maintenance of OFC cable network and associated equipment etc.”
3
Eastern
Works
RailTel/Tender/OT/ER/HQ/2016-17/957
2016-10-07
Excavation of Trenches and laying of OFC through ducts,
testing, commissioning and maintenance of OFC in North
East –I states by RailTel on behalf of BBNL.
4
Northern
Works
RailTel/OT/NR/AV-Shastri Park/16-17/09
2016-10-06
“Supply, Testing and Commissioning of AUDIOVISUAL WORKS OF THE
PROPOSED REGIONAL OFFICE AND NETWORK OPERATING CENTRE OF RAILTEL
CORPORATION OF INDIA LIMITED AT 6TH FLOOR, TOWER 3, DELHI TECHNOLOGY
PARK, SHASHTRI PARK, NEW DELHI-110053”
5
Corporate
Supply
RAILTEL/ TENDER/ OT/ CO/ OP / 2016-17/ Duct/RailTel/338
2016-10-05
Supply of 1539 km Permanently Lubricated HDPE Telecom duct for use as underground optical fibre cable conduits size 40/33 mm and accessories as per latest Specification TEC GR No. GR/TX/CDS-008/03/March 11 with latest amendment”