SUPPLY of 6932 km Permanently Lubricated HDPE Telecom duct for use as underground optical fibre cable conduits size 40/33 mm and accessories as per latest Specification TEC GR No. GR/TX/CDS-008/03/March 11 with latest amendment” for National Optical Fiber Network (NOFN) project as Deposit work on the behalf of M/S Bharat Broadband Network Ltd(BBNL)
2
Western
Works
RailTel/Tender/OTMRyMX-BA & BVI-VR/2O1 5-1 6/07R
2016-02-10
Trenching, laying of duct, blowing of 48F OFC through ducts, splicing, testing & commissioning in Mahalaxmi-Bandra and Borivali-Virar section of Western Railway in Western Region of Railtel.
3
Northern
Supply & Installation
RailTel/OT/NR/CHEMICAL (GEL) EARHTING/15-16/15
2016-01-27
nstallation of Maintenance free Chemical (GEL) Earthing System at various locations of Haryana and Chandigarh
4
Western
Works
RailTel /Tender/OT/WR/NOFN/2015-16/30
2016-01-22
Excavation of Trenches and laying of OFC through ducts, testing, commissioning and maintenance of OFC in the 04 (Four) Blocks (Bagasara, Dhari, Lilia & Savar Kundla) of Amreli District of Gujarat State by RailTel on behalf of BBNL.
5
Western
Works
RailTel /Tender/OT/WR/NOFN/2015-16/31
2016-01-22
Excavation of Trenches and laying of OFC through ducts, testing, commissioning and maintenance of OFC in the 03 (Three) Blocks (Jafarabad, Khambha and Rajula) of Amreli District of Gujarat State by RailTel on behalf of BBNL.